A road that carried thousands towards the battlefields of Europe is now being secured for future generations.
During the First World War, Folkestone became one of Britain’s principal gateways to the Western Front. With tens of thousands based in Folkestone and millions of military personnel and other wartime travellers passing through the town towards the harbour, often descending the steep route then known as “Slope Road” before embarking for France.
In the early 1920s, the route was renamed the “Road of Remembrance” in memory of those who walked it on their way to and from the battlefields of Europe. At its foot stands a Second World War communications structure built into the cliff, used to relay intercepted naval communications, including Enigma messages, onwards to Bletchley Park.
Following a landslip on 27 January 2024, the road was buried beneath soil and vegetation, and the cliff was left unstable. Specialist stabilisation works are now underway, including the installation of 974 Minova soil nails, drilled between approximately 5 and 14 metres into the slope, alongside drainage improvements, erosion-control matting, mesh facing and shotcrete reinforcement.
Minova is proud to be supplying the soil nails used to reinforce the cliff and support the long-term remediation of this historic route.
This Remembrance Day, as work continues above the Road of Remembrance, we pause to remember every person who walked this road into uncertainty, and all those who served and sacrificed.
