The A320 North of Woking Improvements is a major highway scheme designed to increase capacity, improve traffic flow and support future housing development across Runnymede. As part of the works, the existing road required widening between Ottershaw Roundabout and M25 Junction 11.
Excavation into the toe of an existing wooded embankment created a new cutting approximately 690m long and up to 2.5m high. The predominantly granular ground conditions, combined with slope gradients of up to 34°, required a long-term solution to stabilise the cutting and secure approximately 2,000m2²of erosion control facing.
The design also needed to accommodate variations in slope height and gradient across the site, while allowing installation to be completed efficiently alongside the live highway.