Overbreaks. Fractured ground. Stope voids. When cavities halt development and threaten safety, your teams need solutions that restore stability fast and keep everyone moving safely.
Minova’s cavity filling solutions use fast-setting foams and pumpable grouts to deliver immediate, reliable support in challenging conditions.
𝗠𝗶𝗻𝗶𝗻𝗴: From hard rock stope voids to coal longwall goaf, our GeoFoam™ and Carbofill™ systems stabilise broken ground, control goaf conditions, restore safe access, eliminate gas concentration and control airflow with minimal formwork.
𝗜𝗻𝗳𝗿𝗮𝘀𝘁𝗿𝘂𝗰𝘁𝘂𝗿𝗲 & 𝗧𝘂𝗻𝗻𝗲𝗹𝗹𝗶𝗻𝗴: Overbreaks and ground movement demand an immediate response. Our injection foams and pumpable grouts restore structural integrity quickly, prevent water concentration behind the lining and ensure uniform loading of the lining by rock pressure, keeping projects on schedule and people safe.
Across every cavity filling application, Minova delivers:
> Integrated solutions for rapid cavity filling – whatever the cause or conditions
> High-performance, low bulk density products that minimise formwork
> On-site technical support from global teams with decades of experience
